ATG - Richland, WA
Allied Technology Group, Inc – Model G200
Richland, WA, USA


InEnTec sold its first commercial PEM® system to ATG in 1999 for processing mixed hazardous and radioactive wastes.  It was the first facility in the U.S. to receive a mixed RCRA / TSCA permit.  The system began operating in September 2000 and was operated for over 13 months before financial troubles within the company unrelated to the PEM® system forced ATG to shut the facility down and file for bankruptcy.  The PEM® system is still installed in the facility, in cold standby.